Process numbers¶
A process number is a case identifier that ties together everything belonging to the same matter across the database. On the Project side it can be attached to a project and to its tasks, so that all the work on one case can be found from a single number.
Note
This feature is provided by the Process Number - Project (process_number_project) module,
which requires the Process Number (process_number) module.
Configuration¶
To have a process number created automatically for every new project, go to , and, in the Process Number section, enable Create Automatically under the Project option. The setting is per company.
See also
Process numbers for the process number records themselves, and their use in the other applications.
Process number mode¶
Every project has a Process Number Mode:
- Single
The whole project belongs to one case. The Process Number chosen on the project is applied to all of its tasks, and tasks created later inherit it. Changing the project’s process number updates the tasks.
- Multi
Each task carries its own process number. The project itself has none, and every task can be assigned to a different case.
If the project already contains tasks with different process numbers, switching the mode back to Single is refused, so that existing case assignments are not silently overwritten.
Use the Create a new process number link on the project or on the task to generate a number on the spot instead of picking an existing one.
- menu
- Project ‣ Projects ‣ (open a project) ‣ Settings
- shows
- The project settings with the Process Number Mode set to "Single", a process number selected, and the "Create a new process number" link below it.
- highlight
- The Process Number Mode and Process Number fields (red frame).
- data
- Project "Boiler maintenance 2026", process number "PN/2026/0007".
- module
- process_number_project
- notes
- English UI, light theme, 1440px width, crop to the settings block.
Finding the work behind a number¶
Open a process number to see the Projects and Tasks smart buttons with their counts, and the lists of the linked projects and tasks below them. The process number list also shows the linked projects and tasks as tags.